What this work involves
Start with a final kitchen installation drawing. Then establish which walls, floors and connections change. This avoids furniture that does not fit or inaccessible services.
- Removal of the existing kitchen
- Layout and wall changes
- Water, drainage, electrics and ventilation
- Floor and wall finishes
- Measuring, delivery and installation
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Divide renovation into assessable work packages with clear interfaces.
Decide this before construction
Use release points between work sections: design complete, substrate assessed, concealed work recorded and finishes ready. The next party starts from an agreed condition.
Which trade-off matters?
Running many trades simultaneously can appear to save time but increases pressure on access and working space. Compare parallel work with a deliberate sequence by building section.
Compare the complete intervention
Identify coordination, protection and temporary provisions in the budget. Ask which party finishes each interface to avoid gaps between work packages.
Cost factors for this service
Building preparation is often separate from the kitchen price. Include service changes and repairs to adjacent surfaces.
Bring this to the discussion
Kitchen design, installation drawing, dimensions and photographs.
Questions about the work
When should the kitchen be measured?
Agree this with the supplier. After building changes, final measuring may need to wait until the relevant dimensions are reliable.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.