A clear budget starts with clear scope.
The cost follows from the existing building and the agreed work.

Compare the complete intervention
Identify coordination, protection and temporary provisions in the budget. Ask which party finishes each interface to avoid gaps between work packages.
Which trade-off matters?
Running many trades simultaneously can appear to save time but increases pressure on access and working space. Compare parallel work with a deliberate sequence by building section.
What belongs in the budget?
- Survey, investigations and design preparation.
- Demolition, foundations, structure and new building elements.
- Electrical, water, heating and ventilation work.
- Windows, floors, walls, kitchens and bathrooms.
- Access, protection, scaffolding and waste removal.
- Clearly identified provisional sums and change arrangements.
A starting price needs a defined scope.
Ask for work, materials, VAT, assumptions and provisional sums to be clearly described. Undecided items should remain visible so an early estimate is not mistaken for a fully developed final budget.
Compare the content
Consider preparation, protection, timing and reinstatement alongside the total price.