What this work involves
Coordinate structural drawings, openings, services and finished floor levels before preparing the concrete work.
- Slab or wall build-up
- Openings and service penetrations
- Flatness and final finish
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Plan structural deliveries and temporary provisions alongside structural design.
What the drawing needs to explain
Combine the design plan with logistics for storage, deliveries and protected zones. Identify who approves each interface before the next stage begins.
Decide this before construction
Use release points between work sections: design complete, substrate assessed, concealed work recorded and finishes ready. The next party starts from an agreed condition.
Cost factors for this service
Costs depend on volume, formwork, access and finish requirements. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for concrete work & slabs. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging concrete work & slabs?
A structural concrete slab and a decorative concrete finish are different elements. Ask for both to be specified separately.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

