What this work involves
Do not disturb suspect material. Establish the survey, notifications and qualified contractors required for the particular situation.
- Survey report
- Scope and qualified contractor
- Clearance and subsequent scheduling
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Use a responsibility register for design decisions and release points.
What the drawing needs to explain
Combine the design plan with logistics for storage, deliveries and protected zones. Identify who approves each interface before the next stage begins.
Decide this before construction
Use release points between work sections: design complete, substrate assessed, concealed work recorded and finishes ready. The next party starts from an agreed condition.
Compare the complete intervention
Identify coordination, protection and temporary provisions in the budget. Ask which party finishes each interface to avoid gaps between work packages.
Cost factors for this service
Costs depend on investigation, material type, access and removal scope. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for asbestos surveys & removal planning. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging asbestos surveys & removal planning?
The required process depends on materials and work. No in-house asbestos certification is claimed; the appointed specialist must be confirmed beforehand.
Official background: Dutch Government (Dutch).
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.