What this work involves
Discuss the purpose, accessible elements and survey limits. Establish whether additional specialist investigation may be needed.
- Purpose and scope
- Photographs, findings and priorities
- Further investigation and next steps
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Use a responsibility register for design decisions and release points.
What the drawing needs to explain
Combine the design plan with logistics for storage, deliveries and protected zones. Identify who approves each interface before the next stage begins.
Decide this before construction
Use release points between work sections: design complete, substrate assessed, concealed work recorded and finishes ready. The next party starts from an agreed condition.
Compare the complete intervention
Identify coordination, protection and temporary provisions in the budget. Ask which party finishes each interface to avoid gaps between work packages.
Cost factors for this service
Costs depend on building size, access, reporting and investigation depth. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for building condition & maintenance surveys. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging building condition & maintenance surveys?
A visual survey cannot reveal every hidden defect. The report should identify inspected areas and its limitations.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.