What this work involves
Check flatness, moisture and available height. Flooring affects doors, skirting, stairs and heating. Coordinate these junctions before ordering.
- Substrate and preparation
- Heights and transitions
- Material and use
- Underfloor heating coordination
- Skirting, thresholds and maintenance
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Start finishing work from a recorded and assessed substrate condition.
What the drawing needs to explain
Combine the design plan with logistics for storage, deliveries and protected zones. Identify who approves each interface before the next stage begins.
How to review the result
Review each building section and then the whole home. Check transitions, operation and documentation; supplier completion lists do not automatically cover every shared interface.
Cost factors for this service
Removal, repairs, levelling, material and details determine the total.
Bring this to the discussion
Photographs, known floor construction and measurements at doors and transitions.
Questions about the work
Can a new floor go over the existing one?
It depends on stability, moisture, adhesion, height and system requirements. Have the substrate assessed first.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

