What this work involves
List equipment, lighting and controls per room. Coordinate routes with structure and finishes. Use professionals appropriate to the installation.
- Existing system survey
- Capacity and points
- Safe accessible routes
- Kitchen, bathroom and heating coordination
- Testing, records and explanation
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Use a responsibility register for design decisions and release points.
What the drawing needs to explain
Combine the design plan with logistics for storage, deliveries and protected zones. Identify who approves each interface before the next stage begins.
Decide this before construction
Use release points between work sections: design complete, substrate assessed, concealed work recorded and finishes ready. The next party starts from an agreed condition.
Compare the complete intervention
Identify coordination, protection and temporary provisions in the budget. Ask which party finishes each interface to avoid gaps between work packages.
Cost factors for this service
Scope, access and replacement requirements determine the budget.
Bring this to the discussion
Plans showing equipment and points, with existing system information.
Questions about the work
When should connection points be final?
Preferably before walls and floors close. A room plan with furniture and equipment reduces later cutting and repair.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.